Making Progress

The CIS Tutoring and Technology Labs will be open for the first day of classes on a limited schedule in Smith 212 as we put final touches on Smith 234. The schedule and who’s working is in the “What’s Happening” box in the sidebar. Smith 212 will be open for tutoring, study space, and help […]

Furniture

Smith 234 is taking shape. The furniture arrived today. The Google TV’s have also been installed in the informal seating area, as well as outside Smith 212 and 234. [scrollGallery id=4 h=300 w=320]

Windows and Doors

The ATC has a glass window. The Trading Room has a glass wall. The CMT has lots of windows. The Usability and Design Center across the hall from us on the first floor of Smith has a glass-paneled entry way. The CIS Lab in Smith 234 didn’t have any glass. We tried putting in a […]

Colors!

The painters were busy this week. The area behind the Audobon Russett as you walk in will have comfortable seating and a big screen tv.  The areas marked by the Dorset Gold and Brookside Green walls will have study tables and screens for collaboration.  The networking equipment will be installed between the Audobon Russet stripes […]